The runnning completion of micronizer mill

1, on the basis of the device should be installed in a horizontal concrete, land bolt is fixed.
2, when installation should pay attention to the main body of vertical and level.
3, check each part after installation bolt fastening, the presence of loosening and host storehouse door whether such as 
   welcome to tighten.
4, according to the equipment power configuration of power and control switch.
5, check finished, empty load test, the test can be normal production.